The existing bridge has been
replaced and filled to allow heavy vehicles access to Rhodes
Farm treatment site.The towing path follows the security fence
on the right of the double gate parallel to the river to Rhodes
Lock.
.
.
During the winter months it is still
possible to see a small section of coping stones and the rock
face that formed the other bank