|
The section between East Ordsall Lane
and the railway crossing has recently been reclaimed in preparation
for the SnoWorld
development.
The site clearance work included the
demolition of the short Salford No1 tunnel and its portal.
It is not clear what condition Lock
3 and the canal is in below the fill material or if they still
exist.
In 1948 Lock 3 was regated using the
top gates from Prestolee lower staircase locks.
|